Application of an Instrumented Pull-in Head during the retrieval of a flowlinecontaining a hydrate plug and oil inventory
a case study of the MLL-20 GL lineat FPSO Cidade de Niterói
DOI:
https://doi.org/10.70369/kf641e62Keywords:
Hydrate, Instrumented pulling Head, Line retrieval, Decommissioning, Deepwater, Controlled dissociationAbstract
The decommissioning of subsea flexible flowlines containing hydrate plugs and residual oil inventory presents a critical technical and economic challenge in deepwater and ultra-deepwater environments. This paper introduces an innovative methodology for the safe retrieval of lines with complex hydrate blockages. This methodology was successfully developed and implemented during the decommissioning of the flowline GL from well 3-MLL-20D-RJS (FPSO Cidade de Niterói). Conventional methods, such as the widely used N₂ lift, had previously failed to clear a long blockage, incurring substantial costs. To overcome this persistent challenge, a new protocol was centered on the use of an Instrumented Pulling Head (IPH). This paradigm shift leverages the natural thermodynamic changes occurring during the retrieval operations specifically, the simultaneous pressure reduction and temperature increase to promote the safe and controlled dissociation of the hydrate. The instrumented pulling head provides real-time monitoring of the line's internal pressure and the applied pull tension. This capability enables active process management, effectively mitigating the critical risks of overpressure within the line and subsequent mechanical failure. The application of this novel protocol, which is 100% diverless and guided by controlled phases, resulted in the complete success of the operation, ensuring the full retrieval of the line and the safe removal of the residual oil inventory. This approach achieved final cost savings exceeding 95% compared to the previous failed attempts. These results unequivocally demonstrate the effectiveness of the proposed methodology, establishing a new benchmark for safety and efficiency in the retrieval of subsea lines affected by complex blockages.
References
AUSTVIK, A.; LØKEN, K. P.; TORSÆTER, O.; GUDMUNDSSON, J. S. Remediation of hydrate plugs in pipelines. In: INTERNATIONAL CONFERENCE ON GAS HYDRATES (ICGH-4), 4., 2000, Yokohama, Japan. Proceedings [...]. Yokohama: [c.n.], 2000.
CARROLL, J. Natural Gas Hydrates: A Guide for Engineers. 2nd ed. Oxford: Gulf Professional Publishing, 2003.
CENPES. Laudo Técnico Parcial Nº001/2025 -: Análise análise de Água de Processo FPSO Cidade de Niterói MV-18 MLL-20. Rio de Janeiro: Centro de Pesquisas e Desenvolvimento Leopoldo Américo Miguez de Mello, 2025.
HAMMERSCHMIDT, E. G. Formation of gas hydrates in natural gas transmission lines. Industrial & Engineering Chemistry, Washington, v. 26, n. 8, p. 851-855, 1934.
JOSHI, S. V.; Grasso, G. A.; Lafond, P. G.; Rao, I.; Webb, E.; Zerpa, L. E.; Sloan, E. D.; Koh, C. A.; Sum, A. K. Experimental flowloop investigations of gas hydrate formation in high water cut systems. Chemical Engineering Science, 97, 198–209, 2013.
KOH, Carolyn A.; CREEK, Jefferson L. Safety in hydrate plug removal. In: SLOAN, E. D.; KOH, C. A.; SUM, A. K. Natural gas hydrates in flow assurance. Oxford: Elsevier, 2011. cap. 3, p. 37–47. ISBN 978-1-85617-945-4.
MAKOGON, Y. F. Hydrates of Hydrocarbons. Tulsa: PennWell Publishing Company, 1997.
OCEÂNICA. CRD-OPE-081: Procedimento Executivo para Recolhimento de Linhas com Cabeça de Tração Instrumentada. Rio de Janeiro: Oceânica, 2025.
PETROBRAS. Certificado de Liberação de Linha (CLL): Linha de Gas Lift do Poço 3-MLL-20D-RJS. Ordem de Serviço 6000717531. Macaé: Petrobras, 2024a.
PETROBRAS. MD-3913.00-1500-941-R1N-030 Rev.B: Ancoragem Provisória: Instalação de Laçada de Linha Riser GL 3-MLL-20D-RJS FPSO Niterói. Rio de Janeiro: Petrobras, 2025a.
PETROBRAS. PE-2SUB-00965: Comunicação de Anomalias de SMS na SUB. Rio de Janeiro: Petrobras, 2024b.
PETROBRAS. PE-2SUB-01250: Procedimento de Recolhimento de Linhas Submarinas com Presença de Hidrato. Rio de Janeiro: Petrobras, 2025b.
PETROBRAS. PO_FPNIT_MLL-20_GL_6000717531_SVmll25-024: Relatório relatório de Recuperação 1ª, Recolhimento e Corte de 2ª da Linha de GL do Poço 3-MLL-20D-RJS do FPSO Niterói. Rio de Janeiro: Petrobras, 2025c.
PETROBRAS. PP-1PBR-00392: Avaliação e Gestão de Riscos Operacionais Relacionados a SMS. Rio de Janeiro: Petrobras, 2024c.
PETROBRAS. PR-3000.00-1500-291-PMU-002: Alívio de Gás do Anular Durante Recolhimento de Dutos Flexíveis. Rio de Janeiro: Petrobras, 2021c.
PETROBRAS. RL-3010.0N-1519-983-PSE-004 Rev.C: - Análise Preliminar de Riscos: Pull out de 2ª extremidade, com corte emerso e recolhimento do riser da linha de LGL do poço 3-MLL-20D-RJS do FPSO Cidade de Niterói. Macaé: Petrobras, 2025d.
PETROBRAS. Workshop de Remoção de Hidrato: - Remoção de Hidrato em Linhas e Equipamentos Submarinos . Macaé: Petrobras, p. 21, 2025d.
SANTANA, A. R. S. (2024). Desenvolvimento de cabeça de tração instrumentada para as operações de recolhimento de dutos nos campos de Marlim e Voador. Trabalho de conclusão de curso (Pós-Graduação Lato Sensu em Engenharia Submarina), Sistema Educacional Corporativo da Petrobras, Macaé.
SLOAN, E. D.; KOH, C. A. Clathrate Hydrates of Natural Gases. 3rd ed. Boca Raton: CRC Press, 2008.
TECHNIPFMC. Change Request Form (CRF) SKV-CRF-2025-0028: Teste de condutividade do bore antes do inboarding GL MLL-20. FMS4-QMT-14000-01 Rev 7. Houston: TechnipFMC, 2025a.
TECHNIPFMC. Instrução de Trabalho para Uso da Cabeça de Tração Instrumentada. Ref.: 075071-67-PRD-0040 Rev. 0. Houston: TechnipFMC, 2025b.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Damaci Teodoro da Silva Filho, Fabiano Hespanhol Viana, Karine de Fátima Vasconcelos, Tainan Gabardo Miranda dos Santos, Allan Rafael da Silva Santana, Ygor Fernandes dos Santos Manhães Correa

This work is licensed under a Creative Commons Attribution 4.0 International License.