Decommissioning, FPSO, Subsea, Innovation, Cost AvoidanceAbstract
In the retrieval of lines without connectors, lifting tools have been used to enable the recovery of extremities and proper retrieval. In many cases, for opening connections or making cuts in TDP regions, temporary anchoring becomes necessary, usually performed with weights that are then lashed to the line intended for anchoring, thus maintaining its position and preventing its "slippage" toward the Platform. In this scenario, the present work presents the undertaking carried out to use the lifting tool also as temporary anchoring for the line, that is, providing a second and new use for the tool already habitually used. Such development had as its application focus the pull-out campaign of FPSO Cidade de Niterói. There was a first phase of Opportunity Identification, followed by Planning where analysis involving various areas took place, reaching the positive result that indicated application feasibility within a given operational envelope comprising 8 umbilicals. During operations planning, it was identified that this solution would reduce the typical scope from 7 operational steps to a new scope of 3 operational steps. With this, savings of approximately 58% in the total value initially estimated for the pull outs of the 8 UEHs were verified, as well as a reduction of approximately 50% in the total CO2 equivalent emitted, compared to the typical scenario. It should be highlighted that the solution is scalable, having the potential to be extended to other Projects in Petrobras' Portfolio, thus leveraging and capturing even more significant gains for the Company.
References
PETROBRAS. MD-3103.00-6651-274-1DU-001: Alternativas para ancoragem provisória de riser. Revisão 0. Rio de Janeiro: Petrobras, 2023. Sistema de Informação e Documentação Técnica (SINDOTEC).
PETROBRAS. PE-2SUB-01061: Realizar ancoragem provisória em dutos flexíveis e umbilicais. Versão 01.00. Rio de Janeiro: Petrobras, 2024a. Padrão técnico interno. Sistema Integrado de Processos e Padronização (SINPEP).
PETROBRAS. RL-SDMLL24-037: Recuperação 1ª, Recolhimento e pull out 2ª UEH. Revisão 0. Rio de Janeiro: Petrobras, 2024b. Relatório de Operações.
PETROBRAS. RL-CATUP25-052: Ancoragem provisória - Instalação de laçada de linha de produção. Revisão 0. Rio de Janeiro: Petrobras, 2025. Sistema de Informação e Documentação Técnica (SINDOTEC).
SANTANA, A. L. B.; SEMEDO, E. S.; CASTILHO, J. M.; FERNANDES, P. T.; PINTO, W. D.; CASTRO, L.C.E.; SILVA, W.A. da. Challenges to Recover Subsea Umbilicals in Decommissioning Projects. In: OFFSHORE TECHNOLOGY CONFERENCE, Houston, 2023. Proceedings […]. DOI: https://doi.org/10.4043/32214- MS. Disponível em: https://onepetro.org/OTCONF/proceedings- abstract/23OTC/23OTC/D022S058R013/519067. Acessoe m: 22 fev.2026.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Wendell Dias Pinto, Fabiano Hespanhol Viana, Damaci Teodoro da Silva Filho, Karine de Fátima Vasconcelos, Thiago Michel de Souza Dias, Paulo Tavares Fernandes, André Vettori de Moraes e Silva, Guilherme Fernandes Ventura, José Maria Castilho

This work is licensed under a Creative Commons Attribution 4.0 International License.